beautypg.com

American Dryer Corp. AD-115ES User Manual

Page 18

background image

14

C. DRYER ENCLOSURE REQUIREMENTS

It is recommended that the rear of the dryer be positioned approximately 3 feet (0.91 meters) from the nearest

obstruction (i.e., wall) for ease of installation, maintenance, and service. Bulkheads and partitions should be

made of noncombustible materials. The bulkhead facing must not be closed in ALL the way to the top of the

dryer. A 2-inch (5.08 cm) clearance is required.

NOTE: Bulkhead facing should not be installed until after dryer is in place. Ceiling area must be

located a minimum of 12-inches

(30.48 cm)

above the top of the dryer.

IMPORTANT: Even though a minimum of only 12-inches

(30.48 cm)

is required,

18-inches (45.72 cm)

or more is

suggested for steam dryers and especially in cases where sprinkler heads

are over the dryers.

NOTE: When fire sprinkler systems are located above the dryers, a minimum of

18-inches (45.72 cm)

above the dryer console (module) is suggested. Dryers may be positioned side wall to side

wall however, 1 or 2 inches (2.54 or 5.08 cm) is suggested between dryers (or wall) for ease

of installation and maintenance. Allowances must be made for the opening and closing of the

control and lint doors.