Install Cekon plug on the connection cable of the appliance.

Insert Cekon plug into the socket.

To switch off the stationary high pressure cleaner, the Cekon plug
must be easily accessible so that it can be removed from the
mains.

Check gas connection.

Caution
Risk of damage to the appliance on account of over-heating.

Connect the siphon to the boiler floor and fill water.

Fill the boiler via the chimney opening with 4 litres of water.

Before using for the first time, cut off the tip of the lid of the oil
tank on the water pump.

Figure 3 - Pos. 14

Connect the high pressure hose with the hand-spray gun and
the spray pipe and connect it to the high pressure outlet of the
appliance or the high pressure pipe network.

Fasten the nozzle mouth-piece (b) with the union nut (a) on
the spray pipe (d). Please ensure that the sealing ring (c) is
cleanly positioned in the nut.

Remove spring (c) from the lid support (b) of the softener tank
(a).

Fill the tank with Kaercher softener liquid RM 110 (Order no.
2.780-001).

ƽ

Danger

Risk of electrical voltage! Setting may only be done by an electri-
cian.

Determining the hardness of tap water:

through the public water supply works,

using a hardness tester (order no. 6.768-004)

Remove the appliance cover.

Open the switch box at the operating panel.

Set the speed potentiometer (a) according to the water hard-
ness. You can refer to the correct setting in the table.

Example:
For a water hardness of 15 °dH, set 6 on the value scale of the
speed potentiometer. This results in a pause of 31 seconds, i.e.
the solenoid valve will open briefly every 31 seconds.

Electrical connection with plug/ socket

Initial startup

The device is set in the factory as a natural gas device to gas
type G 20 and as LPG device to G 31. While switching over nat-
ural gas devices to G 25 or other natural gases (see type plate)
or the LPG device to G 30 or other LPGs (see type plate), the
natural gas exhaust values in case of natural gas devices and
the LPG exhaust values in case of LPG devices are to be set ac-
cording to the service information.
The enclosed empty type plate will be filled up with values of the
new gas type that is set and will be fixed on the right side of the
device in the address field. At the same time, the plate with the
G 20 (natural gas device) details or G 31 (LPG device) details
fitted at the factory must be removed.

Measures to be taken before start-up

a

b

c

d

Anti-calcification measures

Water hardness (°dH)

5

10

15

20

25

Scale on the speed
potentiometer

8

7

6

5

4,5

Pause (in seconds)

50

40

31

22

16

b

c

a

a