Gb r750 – Karcher HD 19-100 De Tr1 User Manual
Page 61
- 13 -
C1453
00602.
fm
English
Handling and installation information
GB
R750
Carry out handling and installation following
the information provided by the manufactur-
er and stated directly on the packaging and
operating instructions. Those authorized to
carry out these operations should prepare, if
necessary, a "safety plan" to protect and the
safety of people directly involved.
The packaging is also made accord-
ing to the type of transport chosen to
keep sizes as small as possible.
– By road
– By railway
– By sea
– By air
The engine can be transported with
different types of packaging accord-
ing to the destination, the transport
system and preset technical-com-
mercial specifications.
HANDLING AND INSTALLATION INFORMATION
RECOMMENDATIONS FOR HANDLING AND INSTALLATION
PACKAGING AND TRANSPORT
IDM-45300300700.tif
Means of
transport
Lifting means
IDM-45300600500.tif
packaging with wooden case
packaging with cardboard box
packaging with cellophane