General
If you experience any problems with these instructions,
contact the Technical Service Department at 630-784-1000
or toll free in the U.S. at 877-392-7854.
Warranty information
All BEV-V units will be free from defects in materials and
workmanship for a period of three years.
General Specifications
CO2 Water Connections
3/8” (0.95 cm) barbed fittings
with 360° swivel
Drain Water Connections
3/4” (1.91 cm) PVC fittings
Operating Pressure
Min. 30 psi (2.1 kgf/cm²)
Max. 150 psi (10.5 kgf/cm²)
Electrical Connections
None
installing the BEV-V
To ensure material compatibility, a multipurpose glue for ABS,
PVC, and CPVC must be used. This will ensure a proper bond
between the 3/4” PVC and the black ABS Drain Water Inlet.
The BEV-V is furnished with an assortment of plumbing fittings
and insulating tape to aid in installation. However, due to the
variety of equipment and numerous methods of making
connections, all fittings may not be used.
NOTE: Do NOT attach the soda drip tray line to the BEV-V.
The excess soda in the drip tray should drain separately to
the floor drain. The BEV-V should only be attached to the
cold plate drain line that contains the melted ice water.
Before installing the BEV-V, you must determine how to route the
cold plate drain line to the unit. Some dispensers route the cold
plate drain line(s) into the syrup drip tray. You will need to separate
the cold plate drain water from the drip tray by routing a new drain
line underneath the dispenser to the BEV-V (See page 2 for sug-
gested manifold assembly to redirect cold plate drain water).
Figure 1. Typical installation
Figure 2. Specifications Diagram
ICE
COLD PLATE
DRINK DISPENSER
Syrup Lines
Floor Drain
Syrup
Drain
Cold Plate
Drain
Counter
Filtered
CO
2
Water
Pre-Chilled
CO
2
W ater
Max
Drain
CO
2
Water Inlet
(From Carbonator)
CO
2
Water Outlet
(To Cold-Plate)
Drain Water Inlet
(From Cold-Plate)
Drain Water Outlet
(To Floor Drain)
22 inches
(55 cm)
Thermal
Insulation
1. Place the BEV-V unit under the countertop where it is
intended to be installed and secure the unit in place with
the included mounting straps.
2. Use 3/4” PVC tubing to direct the Drain Water Oulet of the
BEV-V unit to the floor drain.
SUGGESTED MATERIALS AND EQUIPMENT NEEDED:
• (10 ft.) 3/4” PVC Pipe
• (4) 3/4” PVC Elbow Fitting
• Multipurpose glue for ABS, PVC, and CPVC
• Tubing Cutter
• PVC Pipe Cutter
• Screwdriver or Drill with Bits
• Channel-Lock Pliers
• Adjustable Wrench
• Measuring Tape
NOTE: Do NOT use copper tubing for the CO2 water line.