American Dryer Corp. Phase 7 / OPL ensor Activated Fire Extinguishing System D120 User Manual
Page 3

IMPORTANT
You must disconnect and lockout the electric
supply and the gas supply or the steam supply
before any covers or guards are removed from
the machine to allow access for cleaning,
adjusting, installation, or testing of any
equipment per OSHA standards.
Please observe all safety precautions
displayed on the equipment and/or specified
in the installation manual included with the
dryer.
CAUTION
Dryer(s) should never be left unattended while
in operation.
“Caution: Label all wires prior to disconnection
when servicing controls. Wiring errors can
cause improper operation.”
«Attention: Lor des opérations d’entretien des
commandes étiqueter tous fils avant de les
déconnecter. Toute erreur de câblage peut
étre une source de danger et de panne.»
WARNING
Children should not be allowed to play on or
near the dryer(s). Children should be
supervised if near dryer(s) in operation.
Under no circumstances should the dryer door
switch(es), lint door/drawer switch(es), or heat
safety circuit(s) ever be disabled.
The dryer must never be operated with any of
the back guards, outer tops, or service panels
removed. Personal injury or fire could result.
The dryer must never be operated without the
lint filter/screen in place, even if an external
lint collection system is used.
Table of Contents
List of Acronyms ____________________________
D.M.S.
Drill Measurement Size
DSI
Direct Spark Ignition
HSI
Hot Surface Ignition
HVAC
Heating, Ventilating, and Air-Conditioning
in WC
Inches of Water Column
L.E.D.
Light Emitting Diode
L.P.
Liquid Propane
OSHA
Occupational Safety and Health Administration
S.A.F.E.
Sensor Activated Fire Extinguishing
UL
Underwriters Laboratory
FOR YOUR SAFETY
Do not dry mop heads in the dryer. Do not
use dryer in the presence of dry cleaning
fumes.
The dryers must not be installed or stored
in an area where it will be exposed to water
and/or weather.
The wiring diagram for the dryer is located
in the front electrical control box area.
Safety Precautions .................................... 4
Mechanical Specifications ........................ 5
Installation Procedures ............................. 7
Location Requirements .............................................. 7
Unpacking/Setting Up ................................................ 7
Dryer Enclosure Requirements .................................. 8
Fresh Air Supply Requirements ................................. 8
Exhaust Requirements ............................................... 9
Electrical Information ............................................... 11
Gas Information ........................................................ 12
Steam Information .................................................... 14
Preparation for Operation/Start-Up .......................... 16
Preoperational Test .................................................. 16
Compressed Air Requirements ................................ 17
Shutdown Instructions .............................................. 18
Service/Parts Information ....................... 18
Service ...................................................................... 18
Parts ......................................................................... 18
Warranty Information .............................. 18
Returning Warranty Cards ....................................... 18
Warranty ................................................................... 18
Routine Maintenance............................... 18
Adjustments .............................................................. 19
Lubrication ................................................................ 19
Burner Hi-Limit Instructions ................... 19
Phase 7 .................................................................... 19
Dual Timer ................................................................ 19
Data Label Information............................ 20
Procedure for Functional Check
of Replacement Components .................. 20