beautypg.com

Initial start-up – Blodgett KLS-E Series User Manual

Page 9

background image

OM-KLS-E 7

Initial Start-Up

Now that the kettle has been installed, you should test it to ensure that the unit is

operating correctly.

1.

Remove all literature and packing materials from inside and outside of the unit.

2.

Clean out any material which might clog or damage the draw-off (product

outlet).

3.

Install the draw-off valve (packed separately) by sliding the assembly into the

tangent and hand-tightening the large stainless steel nut.

4.

Turn on the electrical service to the unit.

5.

Pour water into the kettle unit it is about six inches deep (150 mm).

6.

Test draw-off valve operation by opening it all the way, then closing it before all

the water runs out.

7.

Following “To Start Kettle” instructions in the “Operation” section of this

manual, begin heating the water at the highest thermostat setting. The heating

indicator light should come on immediately, and heating should continue until

the water boils.

8.

To shut down the unit, turn the thermostat dial to “OFF”.

If the unit functions as described above, it is ready for use. If the unit does not func-

tion as described, contact your local Certified Service Agency.

IMPORTANT

BE SURE ALL OPERATORS READ,
UNDERSTAND AND FOLLOW THE

OPERATING INSTRUCTIONS, CAUTIONS,

AND SAFETY INSTRUCTIONS CONTAINED

IN THIS MANUAL.

WARNING

AVOID ALL DIRECT CONTACT WITH HOT

SURFACES. DIRECT SKIN CONTACT COULD

RESULT IN SEVERE BURNS.

AVOID ALL DIRECT CONTACT WITH HOT

FOOD OR WATER IN THE KETTLE. DIRECT

CONTACT COULD RESULT IN SEVERE BURNS.

WATER LEVEL
BETWEEN
LINES

Slide the assembly into the tangent and

hand-tighten the large stainless steel nut.

Each day, confirm the jacket water level

by checking the water gauge.