Chapter2, Installation, Verifying package contents – Allied Telesis AT-8116 User Manual
Page 11: Installing the at-8116, Chapter 2, Verifying package contents installing the at-8116

5
Chapter 2
Installation
The AT-8116 can operate as a stand-alone unit or in conjunction with
any of Allied Telesyn’s other Ethernet and Fast Ethernet offerings. It
supports local and SNMP management.
Verifying Package Contents
❑
AT-8116 Fast Ethernet Switch
❑
Power cord (for 110V units only)
❑
Rack-mounting brackets
❑
Null modem cable
❑
This installation guide
Installing the AT-8116
This section outlines the installation and operation of the AT-8116.
The AT-8116 comes as a 19” rack-mounted unit. However, it can be
placed in either a rack mount, using the enclosed rack-mount brackets,
or on a secure flat surface. Ensure that the unit is within reach of the
necessary connections (i.e. power outlet, Ethernet connections, and, if
the AT-8116 will be monitored via the serial port, a PC, UNIX
workstation, or modem. The unit is powered by a wide-range power
supply for either 115 - 240 VAC 50/60Hz, 0.5 A operation.
Warning
Free air flow must be maintained in order to permit adequate
cooling of the unit. FAN holes MUST be unobstructed.