Reinstall the canopy – LBL Lighting MO Surf Elec Xfmr 100w 277v/12v LED User Manual
Page 4
![background image](/manuals/415506/4/background.png)
4
Connect each of the power feed wires with a low-voltage
transformer wire with a wire nut.
CANOPY
Reinstall the Canopy
4A
1
1
6
1
Place the transformer wires and wire nut connections inside
the power feed port.
Mount the canopy to the power feed port with the two #8-32
flat head screws that were removed earlier.
SCREW
CANOPY
2
4B
6
2
6
3
3
3
Connecting the Center Power Feed
Connector to the MonoRail
5A
4
5
1
2
3
Connect the Monorail to the standoffs so that the Monorail is
secured in place. Refer to the instruction provided with the
standoff.
Make sure that the transformer power is off.
Place the power feed housing onto the Monorail.
Completely back out the screw on the power feed cap.
Screw the power feed cap completely to the power feed
housing. Make sure that the power feed cap is not cross
threaded.
Tighten the screw on the power feed cap for proper power
connection.
MONORAIL
POWER FEED
HOUSING
POWER
FEED CAP
SCREW
5B
6
3
5
4
6
7400 Linder Ave, Skokie, IL 60077
800.323.3226 - 847.626.6300
www.lbllighting.com
© 2013 LBL Lighting.All rights reserved.The "LBL Lighting" graphic is a
registered trademark of LBL Lighting. LBL Lighting reserves the right to
change specifications for product improvements without notification.
A Generation Brands Company