Prepare for installation – LBL Lighting MO Surf Elec Xfmr 100w 277v/12v LED User Manual
Page 2
![background image](/manuals/415506/2/background.png)
1A
2
CONDUIT
4.5” HOLE
FLEXIBLE
CONDUIT
Locate any electrical boxes and conduit already present in the
ceiling.
Cut a 4.5” diameter hole in the ceiling.Take care not to cut
into any existing electrical boxes or conduit.
Attach flexible conduit (not included) to an electrical box and
feed the conduit out of the hole.
If applicable: Screw the cover plate onto the open electrical
box.
Prepare for Installation
Remove the two #8-32 flat head screws from the power feed
port and pull off the canopy with coaxial cable.
SCREW
CANOPY
TRANSFORMER
COVER
PHILLIPS SCREW
Remove the four screws and take off transformer cover.
ELECTRICAL BOX
COVER PLATE
SCREW
1
2
3
4
1
2
3
4
5
5
5
1C
6
6
6
6
6
1B
This manual is related to the following products: