Install the fixture – LBL Lighting Chicago Jazz SCF User Manual
Page 2
2
3
2C
SET SCREW
Loosen
the set screw on the strain relief.
(Do Not Remove)
Install the fixture
NOTE:
Make sure to support the fixture while
adjusting the aircraft cables. An assistant is
recommended to complete the remaining steps.
Feed the aircraft cables through the cable clutches in
the canopy.
Evenly pull the aircraft cables up through the canopy to
raise the fixture to the desired length.
Cut off the excess aircraft cable leaving enough for fine
leveling later.
If necessary loosen the set screw in the strain relief and
feed the power cord from the fixture into the canopy
port.
2
1
2
2
2
3
2
4
NOTE:
The power cord does not support the fixture.
For a casual “lazy cord” look, cut the power cord
several inches longer that the drop height of the
fixture.
Once the desired look is determined, tighten the set
screw on the strain relief.
Mark the cord underneath the strain relief.
2
5
3A
CABLE
CLUTCH
AIRCRAFT
CABLE
STRAIN RELIEF
CANOPY
POWER CORD
3
1
SET
SCREW
4
3B
CORD
5
2
6
Note: Taping down the frayed end of the cloth may
assist in feeding it through the strain relief.