Install the cable post – LBL Lighting Constellation Grande SCF User Manual
Page 5

Install the Cable Post
ANCHOR
Tap the anchor at the marked point up to the threaded portion
with a hammer.
CEILING
4B
CAUTION:
Make sure to support the fixture while
installing, an assistant will be needed to complete
the remaining steps.
7
2
2
4A
10”
Mark the cable post location point 10” away from the center
cable clutch on the canopy. .
7
1
5
CABLE CLUTCH
CABLE POST LOCATION
Place all wires, wire nut connections, and the secondary
strain relief properly inside the electrical box.
Loosen the set screw on the primary strain relief.
Align the canopy center hole with the crossbar center
hole.
Slide the canopy up against the ceiling and secure it in
place by tightening the primary strain relief into the
crossbar. Do not turn the cord.
Push the cord into the canopy and line up the marked
point on the cord with bottom of the primary strain
relief.
Tighten the plastic set screw to secure the cord.
STRAIN RELIEF
CORD
SET SCREW
3C
10
11
12
13
14
15
CAUTION:
CONTINUE TO SUPPORT THE SHADE!
Do not let the fixture hang with out the completion
of the cable standoff installation (next section).