beautypg.com

Chapter 2, Installation, Verifying package contents – Allied Telesis AT FH824U AT-FH824U User Manual

Page 13: Pre-installation requirements, Package contents pre-installation requirements

background image

3

Chapter 2

Installation

Verifying Package

Contents

Make sure your package contains the following items.

!

One AT-FH800 Series Fast Ethernet Hub

!

Four rubber foot pads

!

Stack cable

!

Rack mount bracket kit

!

AC power cord

!

This installation guide

!

Warranty card

Pre-Installation

Requirements

Prior to installing your hub, make sure you observe the following cabling and
installation environment requirements. The hub can be placed directly on your
desktop or mounted in a rack.

!

Do not plug a phone jack connector into any RJ-45 port. This may damage
the hub. Use only twisted-pair cables with RJ-45 connectors that conform
with FCC standards.

!

Make sure each twisted-pair cable does not exceed 100 meters (328 feet).

!

Allied Telesyn recommends using Category 5 cable for all network
connections to avoid any confusion or inconvenience in the future when
you upgrade attached devices to Fast Ethernet.

!

Power requirements: 100 to 240 VAC

±

10% at 50 to 60 Hz

±

3Hz. The

hub's power supply automatically adjusts to the input voltage level.

!

The hub should be located in a cool, dry place, with at least 10 centimeters
(4 inches) of space at the front and back for ventilation.

!

Place the hub out of direct sunlight, and away from heat sources or areas
with a high amount of electromagnetic interference.

!

If you intend to mount the hub in a rack, make sure you have all the
necessary mounting screws, brackets, bolts and nuts, and the right tools.

!

Check if network cables and connectors needed for installation are
available.

This manual is related to the following products: