beautypg.com

ARI Armaturen CODI B PN63 EN User Manual

Page 9

background image

Rev. 0040807006 1404

Page 9

Operating and installation instructions

CODI

®

S/B -

Condensate collection / steam distribution

7.3 Replacing packing rings of the secondary sealing gland packing
(CODI

®

B)

- Dismantle shut-off valve assembly (Pos. 8) as described in 7.1.

- Rotate spindle (Pos. 11) in closing direction.
- Slacken cheese-head screw (Pos. 18).
- Pull handle (Pos. 19) away from spindle (Pos. 11).
- Unscrew sleeve nut (Pos. 6).
- Remove pressure plate (Pos. 21).
- Unscrew spindle guide (Pos. 16) from screw fitting (Pos. 15) and

withdraw from spindle (Pos. 11).

- Dismantle packing rings (Pos. 5).
- Clean packing chamber and spindle surface.
- Push spindle (Pos. 11) into spindle guide (Pos. 16) and fit new

packing rings (Pos. 5).

- Assemble in reverse order (see 7.5).

ATTENTION !
It is vital to avoid damage to spindle surface and
packing chamber surface.

Fig. 5

This manual is related to the following products: