beautypg.com

0 installation – ARI Armaturen CODI B PN63 EN User Manual

Page 6

background image

Page 6

Rev. 0040807006 1404

Operating and installation instructions

CODI

®

S/B -

Condensate collection / steam distribution

4.4 Technical data - remarks

for
- Principal dimensions,
- Pressure-temperature-ratings, operating limits,
- Valves with different types of connection , etc.

refer to datasheet.

4.5 Marking

Details of the CE-marking on the valve:

5.0 Installation

5.1 General notes on installation

The following points should be taken into account besides the general principles governing
installation work:

- Planners / construction companies or operators are responsible for positioning and

installing products.

CE-marking

0045 Notified body

Manufacturer

Address of manufacturer:
refer to item 11.0 Warranty / Guarantee

Typ

Type

Bj.

Year of manufacture

According to the Pressure Equipment Directive appendix 2 diagram 7 valves acc. to article
1 paragraph 2.1.2 (pipes) only show the CE-marking from DN40 onwards.

ATTENTION !
- Remove flange covers if present.
- The interior of valve and pipeline must be free from foreign particles.
- Installation position vertical (series 671/675) or horizontal (series 672/676).

Note installation position with reference to flow, see mark on valve.

- Steam line systems should be designed to prevent water accumulation.
- Lay pipelines so that damaging transverse, bending and torsional forces are

avoided.

- Protect valves from dirt during construction work.
- Connection flanges must mate exactly.
- Valves must not be used to take external forces, e.g. they are not designed for

use as climbing aids, or as connecting points for lifting gear.

- Suitable materials handling and lifting equipment should be used.

See data sheet for weights.

- Centre gaskets between the flanges.
- Precautions against freezing should be taken as a matter of course in all

facilities susceptible to frost.

AWH

This manual is related to the following products: