beautypg.com

0 putting the valve into operation, 0 care and maintenance, 1 cleaning / replacing controller assembly – ARI Armaturen CONA S PN40 EN User Manual

Page 7

background image

Rev. 0040805005 3614

Page 2-7

Operating and installation instructions

CONA

®

S - Ball float steam traps

6.0 Putting the valve into operation

7.0 Care and maintenance

Maintanance and maintenance-intervals have to be defined by the operator according to
the requirements.

7.1 Cleaning / replacing controller assembly

(see Fig. 1- Fig. 2 page 4 and Fig. 3 page 8)
- Remove pipe flange until there is a clearance of roughly 560mm in the pipeline axis to the

left.

- Unscrew hexagon nuts (Pos. 28)
- Pull cover (Pos. 40) away from body until the studs (Pos. 27) no longer protrude into the

cover (Pos. 40). Use lifting gear if necessary.

- Tilt cover (Pos. 40) and controller assy. (Pos. 24) and pull from body (Pos. 1) until

diaphragm capsule (Pos. 24.4) protrudes from body (Pos. 1).

- Raise cover (Pos. 40) and controller assy. (Pos. 24) and withdraw from body (Pos. 1).
- Pull spring clip (Pos. 24.5) off radially and remove diaphragm capsule (Pos. 24.4) from

seat (Pos. 24.1).

- Clean diaphragm capsule (Pos. 24.4) and check sealing components on seat (Pos. 24.1).

If the operator thinks that there is unwarranted leakage at the steam trap we recommend
replacing the diaphragm capsule (Pos. 24.4).

- If the sealing faces at the seat (Pos. 24.1) are damaged, this should also be replaced by a

new component.

- Function test the diaphragm capsule in accordance with 7.
- If the non-return protection (Pos. 57) is faulty, the complete controller (Pos. 24) should be

changed as an assembly.

ATTENTION !
- Before putting the valve into operation, check material, pressure, temperature

and direction of flow.

- Regional safety instructions must be adhered to.
- Residues in piping and valves (dirt, weld beads, etc.) inevitably lead to leakage.
- Touching the valve when it is operating at high (> 50 °C) or low (< 0 °C) media

temperatures can cause injury.
Affix warning notice or protective insulation as appropriate!

Before putting a new plant into operation or restarting a plant after repairs or
modification, always make sure that:
- All works has been completed!
- The valve is in the correct position for its function.
- Safety devices have been attached.

ATTENTION !
- refer to item 10.0 and 11.0 prio
r to dismantling and repair work!
- refer to item 6.0 befo
re restarting the plant !
Prior to installation, threads and seal faces should be coated with temperature-
stable lubricant (e.g. “OKS Anti-Seize Paste” white/metal-free for PN16-40 or
“Rivolta” lubricant and parting agent silver for PN63 onwards).

This manual is related to the following products: