beautypg.com

0 putting the valve into operation, 0 putting the valve into operation -8 – ARI Armaturen STEVI BBD 415 DN 25-50 EN User Manual

Page 8

background image

Page 2-8

Rev. 0040321000 0714

Operating and Installation Instructions

Straight-through blow-down valves - STEVI

®

BBD 415

- The planner / construction company or operator is responsible for positioning and

installing the products.

- The valves are designed for application, not influenced from weather.
- For application outside or in adverse environments like corrosion-promoting conditions (sea

water, chemical vapours, etc.), special constructions or protective measures are recommended.

6.0 Putting the valve into operation

ATTENTION !
- Before putting the valve into operation, check the material, pressure,

temperature and direction of flow.

- All local safety instructions must be observed.
- Residues in piping or valves (dirt, weld beads, etc.) inevitably lead to leakage

and/or damage.

- Touching the valve when it is operating at high (> 50°C) or low (< 0°C) media

temperatures can cause injury.
Affix a warning notice or provide protective insulation as appropriate!

- The actuator can be used in the temperature range from -40°C to +100°C. At

temperatures below zero, it is important to ensure that the control air is dry,
while at high temperatures insulation against heat should be provided where
possible.

Before putting a new plant into operation or restarting a plant after repair or
modification, always make sure that:
- All work has been completed correctly!
- The valve is in the correct position for its function.
- The necessary safety devices have been attached.