Vaisala SHM40 User Manual
Page 25
Chapter 3 ____________________________________________ Humidity Measurement in Concrete
VAISALA _______________________________________________________________________ 23
1111-091
Figure 7
Plugged Tube in Fresh Concrete
4.
When the concrete has hardened, remove the plug and the flange
from the tube. Leave the tube in place.
5.
Use a flat-head screwdriver or other suitable tool to crack the
concrete at the bottom of the tube. This is necessary because during
the curing of the concrete a solid surface forms in the bottom of the
tube. Cracking this surface helps the air in the tube to reach
equilibrium with the humidity in the concrete. See Figure 8 below.
1111-092
Figure 8
Cracking the Concrete at the Bottom of the Tube
See also other documents in the category Vaisala Humidifiers:
- Calibration of Digital Transmitters with HMI41 (36 pages)
- Calibration of Series HMDW2030 and HMP130 Transmitter with HMI41 (14 pages)
- Calibration of Series HMDW6070 and HMP140 Transmitter with HMI41 (30 pages)
- HM34 (30 pages)
- HM40 (47 pages)
- HM44 (52 pages)
- HM70 (83 pages)
- HMD40 (1 page)
- HMD60 (4 pages)
- HMD70 (18 pages)
- HMDW110 (62 pages)
- HMDW80 (51 pages)
- HMI41 (74 pages)
- HMP41 (72 pages)
- HMK15 (39 pages)
- HMM100 (71 pages)
- HMM105 (23 pages)
- HMM211 (42 pages)
- HMM212 (36 pages)
- HMM213 (52 pages)
- HMP140 (28 pages)
- HMP155 (84 pages)
- HMP228 (115 pages)
- HMP230 (163 pages)
- HMP240 (130 pages)
- HMP260 (118 pages)
- HMP60 (71 pages)
- HMT100 (52 pages)
- HMT120 (87 pages)
- HMT130 (95 pages)
- HMT140 (76 pages)
- HMT310 (88 pages)
- HMT310 (105 pages)
- HMT330 (209 pages)
- HMT360 (97 pages)
- HMT360 (63 pages)
- HMT360N (110 pages)
- HMW40 (1 page)
- HMW90 (110 pages)
- RDP100 (14 pages)