Figure 13.
18. Clean the tile and cover the penetration with the
included 12” x 12” 3 Lb. lead flashing. Form the lead
flashing to match the contour of the tile. Measure and
drill a 3/8” hole in the lead flashing for the location of
the 3/8” all-thread. Be sure that there is a minimum of
3” of flashing all the way around the 3/8” all-thread and
tuck the up slope end of the flashing a minimum of 3”
up under the above tile. See Figure 13.
Figure 14.
19. Push another EPDM bonded washer down the threaded
rod until it rests against the top of the flashing being sure
that the EPDM side is facing down. Refer to Figure 14.
20. Thread another 3/8”-16 SS hex nut down the 3/8”
all-thread and tighten it against the washer. Refer to
Figure 14.
Figure 15.
21. Thread the support nut down the 3/8” all-thread to the
desired height. See Figure 15.
22. When installing the remainder of the support nuts be
sure all are at the same height as the others.