Figure 13.

18. Clean the tile and cover the penetration with the

included 12” x 12” 3 Lb. lead flashing. Form the lead

flashing to match the contour of the tile. Measure and

drill a 3/8” hole in the lead flashing for the location of

the 3/8” all-thread. Be sure that there is a minimum of

3” of flashing all the way around the 3/8” all-thread and

tuck the up slope end of the flashing a minimum of 3”

up under the above tile. See Figure 13.

Figure 14.

19. Push another EPDM bonded washer down the threaded

rod until it rests against the top of the flashing being sure

that the EPDM side is facing down. Refer to Figure 14.

20. Thread another 3/8”-16 SS hex nut down the 3/8”

all-thread and tighten it against the washer. Refer to

Figure 14.

Figure 15.

21. Thread the support nut down the 3/8” all-thread to the

desired height. See Figure 15.

22. When installing the remainder of the support nuts be

sure all are at the same height as the others.