beautypg.com

State Tilt Roof User Manual

Page 4

background image

4

Figure 9.

12. Measure from the surrounding tiles to determine where

the 3/8” x 6” SS all-thread will penetrate the tile and

mark the tile accordingly.

13. Drill a 3/8” hole through the tile at the marked location.

See Figure 9.

Figure 10.

14. Replace the tile being certain that the drilled hole aligns

with the SS coupler. See Figure 10.

Figure 11.

15. Position the 3/8” SS all-thread through the hole in

the tile, thread it into the SS coupler and tighten. See

Figure 11.

Figure 12.

16. Thread a 3/8”-16 SS hex nut down the 3/8” SS all-thread

to just above the top surface of the tile. Do not tighten

the nut against the tile. See Figure 12.

17. Push one of the EPDM bonded washers down the 3/8”

all-thread until it rests against the top of the nut. Be

sure that the EPDM side is facing up. See Figure 12.