State Tilt Roof User Manual
Page 4
4
Figure 9.
12. Measure from the surrounding tiles to determine where
the 3/8” x 6” SS all-thread will penetrate the tile and
mark the tile accordingly.
13. Drill a 3/8” hole through the tile at the marked location.
See Figure 9.
Figure 10.
14. Replace the tile being certain that the drilled hole aligns
with the SS coupler. See Figure 10.
Figure 11.
15. Position the 3/8” SS all-thread through the hole in
the tile, thread it into the SS coupler and tighten. See
Figure 11.
Figure 12.
16. Thread a 3/8”-16 SS hex nut down the 3/8” SS all-thread
to just above the top surface of the tile. Do not tighten
the nut against the tile. See Figure 12.
17. Push one of the EPDM bonded washers down the 3/8”
all-thread until it rests against the top of the nut. Be
sure that the EPDM side is facing up. See Figure 12.