Functional Test

Once the mounting, wiring, and other installation steps are completed, proceed to the Radian Series

Inverter/Charger Operator’s Manual. The Operator’s Manual has steps for system commissioning. These

include powering up and performing a functional test on the inverter system, as well as powering
down and adding new devices to an existing system.
Refer to the MATE3 Owner’s Manual for programming instructions and menus.