Flaming River Nova Rack and Pinion Cradle Kits 1962-67 User Manual
Page 6

Page 5 of 10
Modified on 18 Feb 08
JJ/RD/RP/BC
Installation of Flaming River Column
1) Slide the floor mount that is included in the kit over the column tube and then slide the original
floor seal and floor plate over the column tube.
2) Slide the column through the firewall so that the end of the column tube is about a ¼” past the
firewall.
3) Using the original under dash mount, mount the column to the dash. Only snug the mounting
bolts.
4) Set the turn signal arm at the 9 o’clock position; tighten down the mounting bolts to secure the
column.
5) Fasten the original floor seal to the firewall using the bolts removed earlier.
6) Next slide the column mounting bracket so that the mounting flange is flush against the floor
seal plate, and then snug the column mounting bracket to the column tube.
7) Fasten the column bracket to the floor seal using the hardware provided. NOTE: The new floor
mount assembly can be removed and painted.