beautypg.com

81 camaro rack & pinion cradle system – Flaming River Camaro Rack & Pinion Cradle Kits 1970-81 User Manual

Page 9

background image

70-81 Camaro Rack & Pinion Cradle System

70-81 Camaro

Rack & Pinion Steering

100808 revised

8

3)

To install the wheel adapter run the horn contact wire through the hole for the canceling cam and
place the adapter on to the splined column shaft.

4)

Tighten the adapter-retaining nut until the adapter is approximately 1/16” away from the column
shroud.

Installation of the Flaming River Rack and Cradle

1) Install the rack and pinion cradle by sliding it into place between the frame rails, installing the new

hardware using three 7/16” bolts where the gear box was mounted and two 3/8” bolts where the idler
arm was located. Tighten the 7/16” nuts and bolts to 50-65 ft lbs and the 3/8” nuts and bolts to 40 -45
ft lbs.

Installing Cradle In-between Frame Rails

Tighten All

Nuts & Bolts