beautypg.com

Turbo Action CHEETAH SCS SHIFTER Cable Adjustment User Manual

Cheetah scs shifter cable replacement

background image

2/11/04

CHEETAH SCS Shifter Cable Replacement

Installation Instructions

FIRST, READ INSTRUCTIONS CAREFULLY, THEN PROCEED TO INSTALL CABLE PER
THESE INSTRUCTIONS.

Kit Includes:

1 - Cable
1 - Set of instructions

STEP #1:

Preferably, remove the shifter from vehicle.

STEP #2:

Remove cable clamp screw on one side and loosen the other screw far enough to
remove cable from under the clamp, Fig. #1. Note: The shifter mounting bracket
and clamp must be placed back into the same set of holes in the shifter rail.

STEP #3:

Holding the Terminal Block, break the jam nut loose on the cable, Fig. #1&2. Turn
the cable counterclockwise and remove from the Terminal Block.

STEP #4:

Reinstall cable per Fig. #1&2, and be sure clamp goes into the groove in the
cable. DO NOT OVER TIGHTEN screws. If cable is stretched out straight and a
second person turns the the cable clockwise while you guide into Terminal Block,
things will go easier. Now adjust as shown.

Fig. #1

1535 Owens Road, Jacksonville, FL 32218 - (904)741-4850 - FAX (904)741-4853

www.turboaction.com

Remove cable clamp screw and loosen the other screw.
Slide cable out from under clamp.

Holding Terminal Block,
break jam nut loose on the cable.