INSTALLATION INSTRUCTIONS

for Bifold Doors (JII103)

6

INSTALLATION FOR TYPE C

5

A. Upper pivot pin
B. Hanger with T-nut
C. Snugger
D. Top pivot bracket
E. Lower pivot pin

F. Lower bracket
G. Adjustment wrench
H. Track
Screws (not shown)

PARTS INCLUDED

1. If holes are not

drilled in panels,
pre-drill one hole
on each outside
corner of the
assembly 7/16" in
diameter and at
least 1 1/2" deep
in the locations
shown.

2. Tap pivots into

holes with light
hammer blows as
shown. Secure T-nut
by driving a
#8 x 1" pan head
screw through both
holes.

3. Trim track to fit

finished opening if
necessary.

4. Insert the hanger

into one end of the
track. Loosen the
screw on the top
pivot bracket and
position on track
with the screw
toward the jamb.
Snap the snugger
onto the track next
to the hanger, opposite the top pivot bracket as shown.

5. Secure the track to the head jamb with the provided #8 x 1" pan

head screws through the pre-drilled holes. Move the top pivot
bracket back toward the track end until it is 1/4" from the jamb and
tighten the screw.

6. Position the lower

bracket in the jamb,
centered with the
track, and secure
with the provided
#8 x 3/4" flat head
screws.

7. Fold the door

assembly and
position the T-nut
to the hanger.
Using the provided
wrench, screw
hanger into T-nut as
far as possible.

8. Place the upper

pivot pin into the
hole in the top
pivot bracket. Lift
the assembly and
place the lower
pivot pin into the
hole in the lower
bracket. If installing
a four door system,
repeat for the other
assembly. Check
positioning and
operation.

Verify there is a 1/4"
clearance between
the pivot door and
the jamb. Four panel
assemblies should be
snug at the middle.
If adjustments are
necessary, door panels
should be folded to
gain access to the
adjustment screws.
To adjust horizontally:
9. At the top, loosen

the screw in the
top pivot bracket
and move toward
or away from the
jamb until there
is 1/4" clearance.
Retighten.

10. At the bottom,

loosen the
adjustment screw
and move toward
or away from the
jamb until doors
are plumb with jamb, then retighten the screw.

To adjust vertically:
11. Lift assembly slightly and rotate the adjustment screw to the right to

raise doors, and to the left to lower them.

12. Slide the snugger until it is against the jamb opposite the top pivot

bracket, or place between hangers in four door sets.

SKIP to Section 8, “COMPLETE INSTALLATION.”

A

B

C

D

E

F

G

H

Snugger

Top pivot
bracket

Hanger

Pivot door

Lead door

Bottom of
pivot door

Pivot hole

7/8"

1 1/4"

Horizontal
adjustment
screw

Vertical
adjustment
screw

Bracket

Horizontal adjustment
screw

Bracket

Pin

Lower

bracket

T nut

Jamb

side

Upper

pivot pin

Lower

pivot pin

1/4"