JELD-WEN SVC001 Builders Vinyl Sliding Patio Door Handing Reversal User Manual
Page 3

SERVICE SUPPLEMENT
Builders Vinyl Sliding Patio Door Handing Reversal (SVC001)
3
INSTALL OPERATINg PANEL
1. Starting at one end,
press the panel track
with the higher side
toward the interior,
into the sill until it
snaps into place.
Note:
Install panel with
latch hook pointing
upward and facing
the keeper in the side
jamb, and the interlock
facing the fixed panel.
2. Place operating
panel next to the door in an open position. Lift the panel, place the
top into the operating panel track in the head and swing the bottom
over the sill and rest the rollers on the track.
3. Adjust rollers until the panel just clears the track.
4. Install security anti-lifts with flat section facing the exterior into the
operating panel track in header so they will be above the operating
panel when it is closed.
ALIgN LOCk kEEPER
1. Mark jamb at top of
keeper with a pencil.
2. Unscrew and remove
keeper.
3. Mark another line
3/8" below previously
marked line.
4. Mark the center of
the slotted holes and
drill 3/32" pilot holes.
5. Install keeper with
top at lower pencil
mark.
6. Test operation by
closing and locking
operating panel. If
door does not lock
tightly, loosen screws,
adjust keeper up or
down, then retighten.
7. When the lock operates correctly, mark and drill 3/32" pilot holes in
the remaining two holes and secure with screws.
8. Wipe off marks (pencil will easily wipe off vinyl).
fINISh CONVERSION
1. On the exterior, now
the bottom, look
for a groove filler
(a long, thin vinyl
strip that fits into a
groove in the frame).
If a groove filler
is present, lift one
end with a flat head
screwdriver and pull
out to remove.
2. Tap the filler into
the groove at the
new top of the
frame with a rubber
mallet (this will cover
former weep holes).
3. Reinstall screen track
with “nub” facing
the interior.
4. Position top of screen
into top channel.
5. Lift bottom up and
over onto track.
6. Extend all four rollers by turning adjustment screws clockwise until
the screen is level and a slight pressure is felt.
7. The patio door is now ready for installation.
Keeper
Jamb
3/8"
Screen track
“nub”
Interior
side