Warning, Installation, Provide cabinet support install anti-tip brackets – GE ZKD910SFSS User Manual
Page 9: Install warming drawer, Step 1 step 2
WARNING
ANTI-TIP PRECAUTIONS
An anti-tip brace must be installed to prevent the
drawer from tipping forward when opened and
loaded. Failure to do so could result in personal
injury.
IMPORTANT: When installed below a single or double oven, check to be sure
that any oven supports above the cutout do not obstruct the 23-1/2” required
depth of the warming drawer cutout.
• A 2” min. clearance between oven and warming drawer
cutouts are required. Additional clearance may be
required if 2 x 4 blocks are used to support runners or
solid floor of the oven above.
• The warmer drawer may be supported by either a solid
bottom, 2 x 4 or 2 x 2 runners.
• The support must be level and rigidly mounted, flush with
the bottom edge of the cutout.
– There is no way to level the drawer once it has been
installed. Be sure supports are level.
• The entire weight of the drawer is supported by the
runners or solid floor and must be capable of supporting
150 lbs.
9
Installation
PROVIDE CABINET SUPPORT
INSTALL ANTI-TIP BRACKETS
• Slide the left corner of the drawer into the opening.
• Push the power cord into the hole leading to the outlet
location. Thread the cord through as the drawer is being
pushed back into the opening. Check to be sure the
power cord does not get trapped under the drawer.
– If the outlet is installed inside the opening, plug the cord
into the outlet. In this location, the excess power cord
length should be coiled and taped to the right side of
the unit.
• Push the drawer back until the front flange is flush to the
cabinet front.
• Open the drawer fully.
• Drill pilot holes through the holes in the overlapping
frame, one on each corner.
• Drive the wood screws provided into each corner.
INSTALL WARMING DRAWER
23-1/2”
22”
27”
2”x4” or
Equivalent Runners
23-1/2”
2”x4” or
Equivalent Runners
25”
30”
Install 2x4 or 2x2
Anti-Tip Block
Against Rear
Cabinet Wall 9”
From Floor to
Bottom of Block
2x4 or 2x2
Runners or Solid
Bottom
9”
STEP 1
STEP 2