Installation preparation, Tools required, Remove packaging – GE ZKD910SFSS User Manual
Page 6

6
Installation Preparation
TOOLS REQUIRED
Safety Glasses
Drill and
1/16” Bit
Measuring Tape
Phillips Screwdriver
Hand Saw
MATERIALS REQUIRED (provided)
MATERIALS REQUIRED (not provided)
Runners must be level, rigidly mounted and capable
of supporting 150 pounds.
Level
4 Wood Screws
2x2 or 2x4
Wood Block
for Anti-Tip
Security
Adhesive or other hardware for installing
runners or shelf to support warmer drawer
2x2 or 2x4
Lumber for
Runners
REMOVE PACKAGING
• Remove all packing materials and tape.
• Locate package containing 4 wood screws and set
aside.
Parts provided:
• 4 Wood Screws.
• Place carton on a flat surface.
• Open one end of the carton and lift off the top
piece.
• Lift the warmer up and out of the carton.
• Place the drawer on top of the shipping carton to
protect the drawer front and the finished flooring.