Installation preparation, Installation options, When installed under a wall oven – GE ZKD910SFSS User Manual
Page 7
7
Installation Preparation
NOTE: Additional clearance between cutouts may
be required. Check to be sure that oven supports
above the Warming Drawer location does not obstruct
the required interior 23-1/2” depth and 9-1/4” height.
NOTE: Additional clearance between cutouts may
be required. Check to be sure that oven supports
above the Warming Drawer location does not obstruct
the required interior 23-1/2” depth and 9-1/4” height.
INSTALLATION OPTIONS
Dimensions
A
B
ZTD910
28-1/2”
30”
ZKD910
25-1/2” 26-3/4”
When installed under a wall oven:
Warming drawers are approved for installation below only
certain specified wall oven models. See the label attached to
the top of the warming drawer for approved models.
• When installed, the front face of the drawer will be nearly
flush with adjacent cabinetry doors.
• Drawer overlaps will conceal cut edges on all sides of the
opening.
The rough opening for the drawer must be:
– Depth: 23-1/2” min. from inside back to front of cabinet
frame.
– Width: 25-1/2” for 27” wide models, 28-1/2” for 30” wide
models.
– Height: 9-1/4”.
– Allow 2” min. between oven and drawer cutouts for
clearance of overlaps.
NOTE: If you are installing in frameless cabinets, it may
be necessary to install 1/2” wide cleats to accept drawer
mounting screws. See drawer for mounting screw locations.
Installation Below
a Single Oven
Installation Below
a Double Oven
2x2 or 2x4 Anti-Tip
Block Against Rear
Wall, 9” From Floor
to Bottom of Block
1” Min. Above Toekick
Allow 5/8”
Overlap on
All Sides
23-1/2”
Min. Inside
Oven
Cutout
2” Min.
9”
A
B
9-1/4”
23-1/4”
10-1/2”
2x2 or 2x4 Anti-Tip
Block Against Rear
Wall, 9” From Floor
to Bottom of Block
1” Min. Above Toekick or Adjust
to Oven Installation Height
23-1/2”
Min. Inside
Oven
Cutout
2” Min.
9”
A
B
9-1/4”
23-1/4”
10-1/2”
Allow 5/8”
Overlap on
All Sides