beautypg.com

Operations, Power up the server blade, Power down the server blade – HP ProLiant BL660c Gen8 Server Blade User Manual

Page 12

background image

Operations 12

Operations

Power up the server blade

The Onboard Administrator initiates an automatic power-up sequence when the server blade is installed. If

the default setting is changed, use one of the following methods to power up the server blade:

Use a virtual power button selection through iLO.

Press and release the Power On/Standby button.

When the server blade goes from the standby mode to the full power mode, the system power LED changes

from amber to solid green. The health status LED bar flashes green when the Power On/Standby Button
service is being initialized. For more information about the system power LED status, see "Front panel LEDs
("

Front panel LEDs and buttons

" on page

6

)."

For more information about the Onboard Administrator, see the enclosure setup and installation guide on the
HP website (

http://www.hp.com/support/oa

).

For more information about iLO, see "HP iLO (on page

51

)."

Power down the server blade

Before powering down the server blade for any upgrade or maintenance procedures, perform a backup of
critical server data and programs.

IMPORTANT:

When the server blade is in standby mode, auxiliary power is still being provided

to the system.

Depending on the Onboard Administrator configuration, use one of the following methods to power down
the server blade:

Press and release the Power On/Standby button.
This method initiates a controlled shutdown of applications and the OS before the server blade enters

standby mode.

Press and hold the Power On/Standby button for more than 4 seconds to force the server blade to enter

standby mode.
This method forces the server blade to enter standby mode without properly exiting applications and the
OS. If an application stops responding, you can use this method to force a shutdown.

Use a virtual power button selection through iLO.
This method initiates a controlled remote shutdown of applications and the OS before the server blade
enters standby mode.

Use the Onboard Administrator CLI to execute one of the following commands:

o

poweroff server [bay number]
This command initiates a controlled shutdown of applications and the OS before the server blade
enters standby mode.