background image

Setup 27

WARNING:

To reduce the risk of personal injury or damage to the equipment, be sure that:

The leveling jacks are extended to the floor.

The full weight of the rack rests on the leveling jacks.

The stabilizing feet are attached to the rack if it is a single-rack installation.

The racks are coupled together in multiple-rack installations.

Only one component is extended at a time. A rack may become unstable if more than one

component is extended for any reason.

WARNING:

To reduce the risk of personal injury or equipment damage when unloading a rack:

At least two people are needed to safely unload the rack from the pallet. An empty 42U rack

can weigh as much as 115 kg (253 lb), can stand more than 2.1 m (7 ft) tall, and might
become unstable when being moved on its casters.

Never stand in front of the rack when it is rolling down the ramp from the pallet. Always handle

the rack from both sides.

Installing the chassis

The chassis requires installation in a rack. Install the rack rails, and then install the chassis and other
components.
For more information, see the HP ProLiant SL4500 Series Setup and Installation Guide and the Quick Deploy

Rail System Installation Instructions that ship with the rack hardware kit.

Installing hardware options

Install any hardware options before initializing the node. For options installation information, see the option
documentation. For node-specific information, see "Hardware options installation (on page

30

)."

Installing a node into the chassis

Install the component as indicated.