Installing the chassis, Installing hardware options, Installing a node into the chassis – HP ProLiant SL4545 G7 Server User Manual
Page 27
Setup 27
WARNING:
To reduce the risk of personal injury or damage to the equipment, be sure that:
•
The leveling jacks are extended to the floor.
•
The full weight of the rack rests on the leveling jacks.
•
The stabilizing feet are attached to the rack if it is a single-rack installation.
•
The racks are coupled together in multiple-rack installations.
•
Only one component is extended at a time. A rack may become unstable if more than one
component is extended for any reason.
WARNING:
To reduce the risk of personal injury or equipment damage when unloading a rack:
•
At least two people are needed to safely unload the rack from the pallet. An empty 42U rack
can weigh as much as 115 kg (253 lb), can stand more than 2.1 m (7 ft) tall, and might
become unstable when being moved on its casters.
•
Never stand in front of the rack when it is rolling down the ramp from the pallet. Always handle
the rack from both sides.
Installing the chassis
The chassis requires installation in a rack. Install the rack rails, and then install the chassis and other
components.
For more information, see the HP ProLiant SL4500 Series Setup and Installation Guide and the Quick Deploy
Rail System Installation Instructions that ship with the rack hardware kit.
Installing hardware options
Install any hardware options before initializing the node. For options installation information, see the option
documentation. For node-specific information, see "Hardware options installation (on page
)."
Installing a node into the chassis
Install the component as indicated.