beautypg.com

Installing the fbwc capacitor pack – HP ProLiant SL270s Gen8 Server User Manual

Page 42

background image

Hardware options installation 42

7.

Remove the GPU shelf.

8.

Install the cache module in the SAS cache module connector on the system board. For connector
locations, see "System board components (on page

9

)."

9.

Install all components removed from the server.

10.

Install the server into the chassis ("

Installing the server into the chassis

" on page

23

).

11.

Power up the server (on page

15

).

Installing the FBWC capacitor pack

WARNING:

To reduce the risk of personal injury from hot surfaces, allow the drives and the

internal system components to cool before touching them.

CAUTION:

To prevent damage to electrical components, properly ground the server before

beginning any installation procedure. Improper grounding can cause ESD.