beautypg.com

HP 3PAR Geocluster Software User Manual

Page 33

background image

3PAR GeoCluster 1.0.0.14 for Windows User’s Guide

320-200263

Page 33

4.1.2.3

Failover to a Remote Site Node, with Remote Copy Interrupted.

Figure 4-3: Failover to remote node, with Remote Copy disrupted.

A failover to a remote site with Remote Copy disruption node can be initiated for the
following reasons:

Hardware or software failure on the local site affecting the Remote Copy System and all of
the local cluster nodes.

Failure on the local site InServ.

Changes to Remote Copy

This scenario will cause the following changes to the Remote Copy organization:

The secondary Remote Copy group, located on the remote site, will have its role changed to
primary-rev.

If the local InServ is still functional, the primary Remote Copy group, with no knowledge of
the Remote Copy group role change, will retain its role.

This manual is related to the following products: