BNU-LW wiring order

12 Lonworks Gateway

BNU-LW wiring order

A

B

+10V

GND

TP/FT-10

Power

BMS Control (PC)

Fire detection sensor
(Use DC 12V or below)

F1

F2

LAN

LON

PWR

12V GND

PI485
terminal

Central

controller

PI485

VOC

GND

C

D

10V

GND

BUS_A

BUS_B

LG does NOT supply this section ( Connection and Installation)

LonWorks
Adaptor

LG supply

[Wiring sequence]

1. Connect 485 communication line

- Pay attention to BUS A and BUS B polarity

(Refer to the G/W manual for DIP S/W
information for 485 G/W.)

2. Connect the Lonworks communication line

(TP/FT-10)
- No polarity.

3. Power supply (Select one from No. 1 or 2)

Use DC 12V adapter
- Connect to No. 6 jack from name of each

part.

Supply DC 12V to installation site
- Connect 12V and GND to No. 7 and 8

terminals.

4. Interface with simple central controller

- Set the DIP S/W No. 2 of the simple central

controller to ON and configure the setting
according to the rotary S/W address. (Refer
to setting part when connection to simple
central controller (page 20) for details.)

5. Connect fire detection sensor

- When the signal of DC 12 or below is

transmitted in case of a fire, the indoor unit
and ventilation product that is connected to
BNU-LW will all be turned off.