beautypg.com

Anchor Industries NAV50-1204 User Manual

Page 11

background image

10

LIFTING TOP FRAME

(FIRST SIDE)

INSTALL UPRIGHTS. AT INTERMEDIATE
LOCATIONS, INSTALL UPRIGHT BRACES
AS WELL

UPRIGHT BRACES

USING HEAVY-DUTY NAVI=TRAC FRAME
LIFTS, LIFT ONE SIDE OF FRAME. SLIDE
UPRIGHTS ONTO BOTTOM OF WELD-
MENTS ON THE RAISED SIDE AND PIN.
BE SURE ALL RAFTER AND HIP PINS ARE
SECURE, AS WELL.

INSERT BASEPLATES INTO UPRIGHTS AND
BOLT. NOTE: SQUARE FRAMES AND END
MODULE FRAMES MUST USE FIXED BASE-
PLATES. HINGED PLATES ARE TO BE USED
ONLY ON PIVOTING MIDDLE BEAMS FROM
THE EXTENSION FRAME SETS.

FABRIC LIES LOOSELY ON FRAME UNTIL
UPRIGHTS ARE INSTALLED AND STAKED

LIFT TOP FRAME (SECOND SIDE)

1. LIFT 2ND SIDE OF FRAME TO INSTALL OPPOSITE SIDE CORNER

AND INTERMEDIATE UPRIGHTS.

2. INSTALL UPRIGHT BRACES AT ALL INTERMEDIATE UPRIGHTS.

10-T

10-B

NOTE: BEFORE TENSIONING FABRIC, INSPECT
THE FRAME TO ENSURE INTERMEDIATE
RAFTER, BRACE AND HIP PINS ARE PROPERLY
SEATED IN THE WELDMENT FITTINGS AND
SECURED BY LANYARD PINS.

FABRIC NOT SHOWN