Ouellet OWC-M User Manual
Page 16
16
8. Unroll the OWC-M sections while adhering to the required clearances and anchor cables onto the thermal
insulation using the fasteners supplied with the kit. It is very important to solidly anchor the cables onto
the thermal insulation using the fasteners to ensure the installation is securely in place during the concrete
pouring process.
Note: We recommend loosely anchoring the fasteners while first unrolling the sections (in the event of errors
or modification of boundaries) and to anchor the cables more firmly thereafter when the process is complete
(see step 4.5.3).
9. For bypassing walls and obstacles, please refer to the instructions in paragraph 4.5.1.
4.5.1 Bypassing walls and obstacles
• Never attempt to cut or shorten a heating cable.
• Be very careful while maneuvering onto the heating cables.
• It is important not to subject heating cables to any kind of mechanical
stress (stretching, bend radius less than 1.5” (38 mm), notches).
A. Upon encountering walls, simply cut the mat and rotate it in another direction. Use scissors to cut
the mats, being very careful not to damage the cables and use the floor fasteners to secure both
extremities of the mats onto the thermal insulation.
WARNING!
Image 10
Image 11
Image 12
Image 8
Image 9