beautypg.com

Blue-White C-600P CHEM-FEED Diaphragm Pump User Manual

Page 8

background image

6

0

1

2

3

4

5

C-600

Page 8

Discharge Tube

(Opaque P.E.)

Outlet Adapter

Tube Nut

Inlet Adapter

Tube Nut

Suction Tubing

(clear PVC)

Pump Head

FootValve

FootValve Assembly

Must be installed in

a vertical position.

FootValve Assemble

Ceramic
Weight

Suction Tubing

Suction Tubing

Clamp

Lock Nut

Footvalve Adapter

O-Ring

Ceramic Ball

O-Ring

O-Ring

Footvalve Body

Footvalve Strainer

FIG. 4.8 C-600P

FootValve Assy.

C-600P

PumpHead

C-600HV

PumpHead

C-600HV

FootValve Assy.

4.3.4

Injection/Check Valve Fitting Installation -
The Injection/Check valve fitting is designed
to install directly into either 1/4” or ½” female
pipe threads. This fitting will require periodic
cleaning, especially when injecting fluids that
calcify such as sodium hypochlorite. These
lime deposits and other build ups can clog the
fitting increasing the back pressure and
interfering with the check valve operation.

Install the Injection/Check valve directly into
the tee fitting. Do not install the fitting into a
pipe stud and then into the tee. The solution
must inject directly into the flow stream.

Use PTFE thread sealing tape on the pipe
threads. Push the opaque outlet (discharge)
tubing onto the compression barb of the
Injection/Check valve fitting. Use the tube nut
to secure the tube. Hand tighten only.

FIG. 4.9 C-600P

INJECTION/CHECK VALVE

TEE INSTALLATION AND EXPLODED VIEW

This manual is related to the following products: