Blue-White C-600P CHEM-FEED Diaphragm Pump User Manual
Page 8

6
0
1
2
3
4
5
C-600
Page 8
Discharge Tube
(Opaque P.E.)
Outlet Adapter
Tube Nut
Inlet Adapter
Tube Nut
Suction Tubing
(clear PVC)
Pump Head
FootValve
FootValve Assembly
Must be installed in
a vertical position.
FootValve Assemble
Ceramic
Weight
Suction Tubing
Suction Tubing
Clamp
Lock Nut
Footvalve Adapter
O-Ring
Ceramic Ball
O-Ring
O-Ring
Footvalve Body
Footvalve Strainer
FIG. 4.8 C-600P
FootValve Assy.
C-600P
PumpHead
C-600HV
PumpHead
C-600HV
FootValve Assy.
4.3.4
Injection/Check Valve Fitting Installation -
The Injection/Check valve fitting is designed
to install directly into either 1/4” or ½” female
pipe threads. This fitting will require periodic
cleaning, especially when injecting fluids that
calcify such as sodium hypochlorite. These
lime deposits and other build ups can clog the
fitting increasing the back pressure and
interfering with the check valve operation.
Install the Injection/Check valve directly into
the tee fitting. Do not install the fitting into a
pipe stud and then into the tee. The solution
must inject directly into the flow stream.
Use PTFE thread sealing tape on the pipe
threads. Push the opaque outlet (discharge)
tubing onto the compression barb of the
Injection/Check valve fitting. Use the tube nut
to secure the tube. Hand tighten only.
FIG. 4.9 C-600P
INJECTION/CHECK VALVE
TEE INSTALLATION AND EXPLODED VIEW