beautypg.com

Operation verification tests, Performance tests, Current-monitoring resistor – Agilent Technologies 6613C User Manual

Page 14: Programming

background image

2 - Verification and Performance Tests

14

Current-Monitoring Resistor

To eliminate output-current measurement error caused by voltage drops in the leads and connections, connect the
current monitoring resistor between the -OUT and the load as a four-terminal device. Connect the current-monitoring
leads inside the load-lead connections directly at the monitoring points on the resistor element.

Operation Verification Tests

To assure that the supply is operating properly, without testing all specified parameters, perform the turn-on and
checkout procedures given in the User’s Guide.

Performance Tests

NOTE:

A full Performance Test consists of only those items listed as “Specifications” in Table A-1 of the
User’s Guide, and that have a procedure in this document.

The following paragraphs provide test procedures for verifying the supply's compliance with the specifications listed
in Table A-1 of the User’s Guide. All of the performance test specifications are entered in the appropriate
Performance Test Record Card for your specific model. You can record the actual measured values in the column
provided in this card.

Programming

You can program the supply from the front panel keyboard or from a GPIB controller when performing the tests. The
test procedures are written assuming t hat you know how to program the supply either; remotely from a GPIB
controller or locally using the control keys and indicators on the supply's front panel. Complete instructions on
remote and local programming are given in the User’s Guide and in the Programming Guide.

Table 2-2. Programming and Output Values

Model

Full scale

Voltage

Vmax

Full Scale

Current

Imax

Isink

OV Max

6611C

8

8.190

5

5.1187

- 3 A

8.8

6612C

20

20.475

2

2.0475

- 1.2 A

22

6613C

50

51.187

1

1.0238

- 0.6 A

55

6614C

100

102.38

0.5

0.5118

- 0.3 A

110