Correct – WycoTool Single and Double Powerhead User Manual
Page 7
![background image](/manuals/366067/7/background.png)
Page 7
Form: 01-SCR-UM-00442 Rev 6/12
UPPER HANDLE INSERTION
FASTENING UPPER HANDLE
THROTTLE ASSEMBLY
Place the throttle lever on the left hand handle just
below the hand grip. Position the lever so it clears
the handle guard in all positions. Place the lever
ring clamp around the handle bar and tighten with
a flathead screwdriver and adjustable pliers. Use
the zip ties provided to keep the throttle cable
tight to the handle bars.
Check to make sure the throttle adjustment cable’s,
cable stop is fully seated into the throttle adjust-
ment linkage on the carburetor. The metal cable
stop should be completely inside the throttle
adjustment linkage as shown.
THROTTLE ASSEMBLY LOCATION
Correct
THROTTLE ASSEMBLY DETAIL
If the cable stop is not fully seated, loosen the
throttle control adjustment screw and grab the
end of the adjustment cable with the slip joint pli-
ers. Pull gently on the cable until the cable stop is
completely within the throttle adjustment linkage.