beautypg.com

Correct – WycoTool Single and Double Powerhead User Manual

Page 7

background image

Page 7

Form: 01-SCR-UM-00442 Rev 6/12

UPPER HANDLE INSERTION

FASTENING UPPER HANDLE

THROTTLE ASSEMBLY

Place the throttle lever on the left hand handle just

below the hand grip. Position the lever so it clears

the handle guard in all positions. Place the lever

ring clamp around the handle bar and tighten with

a flathead screwdriver and adjustable pliers. Use

the zip ties provided to keep the throttle cable

tight to the handle bars.

Check to make sure the throttle adjustment cable’s,

cable stop is fully seated into the throttle adjust-

ment linkage on the carburetor. The metal cable

stop should be completely inside the throttle

adjustment linkage as shown.

THROTTLE ASSEMBLY LOCATION

Correct

THROTTLE ASSEMBLY DETAIL

If the cable stop is not fully seated, loosen the

throttle control adjustment screw and grab the

end of the adjustment cable with the slip joint pli-

ers. Pull gently on the cable until the cable stop is

completely within the throttle adjustment linkage.