Base Plate along Sidewall. Use two Bolts M10x15(31) for
Assembly Instructions 40x60x18 Domed Style Truss Building
10
Version 3.1
Please DO NOT return unit to store or dealer. For all questions or shortages please contact
Customer Service at: 800-447-7079 or 203-877-7070
Figure 12 Frame installation for Front and Back Panel
Figure 13 Installation of Front and Back Wall
Step #6 – Wind Stabilizer Cables and Turnbuckles
SIDEWALL WIND STABALIZERS
On each side of frame assembly, cables with turnbuckle
adjustments are provided to align and strengthen frame
before installing cover. Turnbuckle & Cable (Part #42)
are to be placed in a ‘v’ pattern as shown on Figure 1 for
both sidewalls. Beginning at the base of arch #3 and #5,
attach the cables from the base to the upper end of
arches #2 & #4 and to Arches #4 and #6. After installing
all cables, tighten the turnbuckles slightly to adjust the
arches vertically and to add rigidity.
END ARCH STABALIZERS
On each end of frame assembly, cables with turnbuckle
adjustments are provided to align and strengthen frame
before installing cover. Turnbuckle & Cable (Part #42)
are to be placed from the Door Track Baseplate to the
upper corner of the Curved Tube (#3A). Install the
cables, and tighten the turnbuckles slightly to adjust the
arches vertically and to add rigidity
.
Figure 14 Position of Wind Stabilizers (turnbuckle and
steel wire) at the sidewall
Step #7 – Bolt Ratchets to Base Plates
Attach Tie Down Ratchet Assemblies (Part #32) to each
each sidewall ratchet to secure to Base.
MAIN COVER INSTALLATION
Step #8 – Prepare Frame and Position Main Cover
To elongate the life of Main Cover, put a small square of
duct tape (field supplied) over each bolt head on frame
that comes in contact with cover. The tape acts as a