Site preparation – Rhino Shelter ROUND-14W X 24L X 10H User Manual
Page 2

Assembly Instructions Boat/SUV Storage 14x24x10
P
u
a
10
CSU-5020
Center Straight Uprights
2
CW-2800
Corner Wind Brace
25
SCR-5030
Swedged Side/Base Ridge Poles
5
ECR-5031
End Cross Poles – plain ends
8 TB-3004
Turnbuckles
35
CBN-3005-3
Carriage Bolts – 3 1/4”
35 CBN-3005-N 9/16”
Nuts
35
CBN-3005-W Washers – 9/16” Cupped
2
R-3003
3/16” Rope
8
BC-36
Bungee Cord Door Hold Ups
14 DBA-3000 Earth
Cable
Anchors
14
UB-3002
U Bolts with Nuts
1
DR-3001
36” Drive Rod for Anchors
4
EP-1000
1-5/8” Plastic End Plugs
10
EP-1001
1” Plastic End Plugs
Note: All Side and Base Ridge Poles MUST Be on
Inside of Arch Frame Members. Top Ridge Poles
MUST be on Outside of Arch Frame members,
except at Ends. See Frame Assembly Step 5.
Interior Arches
Side Ridge
Poles
Assembly Instructions V2.2
Please Do NOT Return Assembly to Dealer or Store. For All Assembly Questions or Shortages Please Call MDM Products Directly
Customer Service 800-447-7079 or 203-877-7070
2
End Arch with Foot
Top Ridge
Poles
Base Ridge Poles
Wind Brace
Center Straight Uprights
SITE PREPARATION
Select a level or as close to level as practical location for
your Rhino Shelter unit. The unit should be placed on a
base of materials suitable for the storage load to be
protected. The unit should not be located under trees,
which will shed hard fruit such as apples, walnuts, or
heavy pine cones. The cover of your unit will protect
against normally leaves and light debris, however large
branches or other falling items may cause puncture or
tears in the cover material.
Take notice of drainage around your intended location.
Water draining from the surrounding terrain should be