beautypg.com

Stuart Turner PH 35 ES B User Manual

Page 14

background image

- 14 -

Cont ...

1. System

Flushing

This pump-set incorporates plastic components that must not come into

contact with solder flux, acid-based descalents or aggressive cleaning

agents. The pipework system should be flushed out prior to the pump being

connected to ensure any contaminants/chemical residues and foreign

bodies are removed from elsewhere in the system.

2. Liquid

Supply

Always ensure that liquid storage capacity is adequate to meet the demand.

Ensure the pump chamber is full of liquid before starting the pump. Failure

to do this could result in seal damage. To ensure dry running does not

occur the pumps must be primed as described in priming section. Do not

run pump dry.

3. Ensure electrical supply is compatible with the details that are stated on the pump

rating plate. (The wrong voltage or frequency can be dangerous and may damage

the

pump.)

4. Priming

a) Flooded suction installation

The pump must be primed (filled with liquid) before starting. Turn on liquid

supply, prime and vent the pump by unscrewing the priming plug (Figs. 12 & 13)

slowly until all air escapes and liquid emerges. Re-tighten plug.

b) Suction lift installation

A footvalve and strainer must be fitted to the end of the inlet pipework. Prime the

suction pipework by filling before connecting to the pump. Prime the pump by

filling via the priming plug (Figs. 12 & 13).

Outlet

Outlet

Inlet

Inlet

Priming
Plug

Priming
Plug

K7-2
Fig. 12

PH 35 ES B,
PH 45 ES B
Fig. 13

This manual is related to the following products: