4 sending the setup data, Sending the setup data -7, Sending the input parameters (for the pr300 only) – Yokogawa PR300 Power and Energy Meter User Manual
Page 16

<2. Configuring the Power and Energy Meter>
2-7
2.4 Sending the Setup Data
The following four methods are available for sending the setup data.
• Send the input parameters (for the PR300 only).
• Send the parameter setting.
• Send the display pattern setting (for the PR300 only).
• Send collectively (input parameters, parameter setting, and display pattern setting)
Note
To send the setup data, set the communication and machine information correctly.
Sending the Input Parameters (for the PR300 Only)
Send only the input parameter data to the device.
1
. Set the input parameters, and then click Send Input Parameters.
A confirmation dialog box for sending the setting opens.
2
. Click OK.
The sending starts. When the sending of the input parameters is complete correctly,
a message appears to indicate it.
3
. Click OK.
IM 77C01Y01-01E
- EJA120A (79 pages)
- EJA130A (2 pages)
- EJA130A (4 pages)
- EJA120A (31 pages)
- EJA130A (47 pages)
- EJA120A (40 pages)
- EJA438 (5 pages)
- EJA120A (6 pages)
- EJA115 (85 pages)
- EJA120A (47 pages)
- EJA210A (70 pages)
- EJA130A (4 pages)
- EJA430A (78 pages)
- EJA210E (89 pages)
- EJA210E (170 pages)
- EJX120A (4 pages)
- EJA210E (9 pages)
- EJX115A (55 pages)
- EJA210E (41 pages)
- EJA210E (96 pages)
- EJA210E (52 pages)
- EJX910A (9 pages)
- EJX910A (103 pages)
- FlowNavigator Software (163 pages)
- EJX910A (55 pages)
- EJX910A (175 pages)
- EJX910A (83 pages)
- EJA530A (67 pages)
- EJA120A (83 pages)
- EJX530A (52 pages)
- EJA110E (4 pages)
- EJA110E (85 pages)
- EJX120A (85 pages)
- EJA118 (76 pages)
- EJX118A (64 pages)
- EJA438 (72 pages)
- EJA430E (85 pages)
- EJX430A (76 pages)
- EJA430E (7 pages)
- EJX430A (6 pages)
- EJX430A (40 pages)
- EJA430E (96 pages)
- EJA430E (41 pages)
- EJX438A (10 pages)
- ADMAG AXR (194 pages)