beautypg.com

English, Stop, Ba b – Pfister RT6-3DFC User Manual

Page 3: Thick wall installation thin wall installation

background image

ENGLISH

ENGLISH

THICK WALL INSTALLATION

THIN WALL INSTALLATION

6

7

8

9

Go To Step 10

STOP

6 DIVERTER INSTALLATION

From above deck, place Washer (6A) and slide and thread Diverter Body (6B) into Main

Body (6C). Be sure to position Diverter Body (6B) with Set Screw Hole (6D) facing

tub. Secure Diverter Body (6B) with Set Screw (6E). Thread Rod (6F) into Diverter

Body (6B).

7 SPOUT INSTALLATION

Place Lower Base (7A) over Diverter Body (7B). Assemble and align Quick Connect

Spout (7C) onto Diverter Body (7B) and tighten Set Screw (7D). Place Button (7E).

8 SPOUT INSTALLATION

Place Lower Base (8A) over Diverter Body (8B). Assemble and align Quick Connect

Spout (8C) onto Diverter Body (8B) and tighten Set Screw (8D). Place Button (8E).

9 KNOB INSTALLATION

Place Knob (9A) onto Diverter Stem (9B) and tighten Set Screw (9C) as shown. Make

sure Set Crew (9C) is securely tighten to Knob (9A).

For pressure testing: Seal Spray Hose (9D) with Plug (9E) (Supplied with Rough-In

0X6-44). Run water and perform pressure test. Look for leaks.

WARNING: Pressure testing is not to exceed 250 PSI (1724 kPa). Make sure

pressure is balanced between hot and cold inlets.

WARNING: Differential pressure of hot and cold inlets must not exceed 100

PSI (689 kPa).

CAUTION: Slowly remove Plug (9E) to relieve pressure.

3

1”

(25.4 mm)

3”

(76 mm) Max.

1

5

/

8

(41 mm)

1

3

/

8

(35 mm) Max.

6B

6A

6C

6E

6D

6F

8E

8D

8A

8B

8C

7D

7E

7A

7C

7B

9A

9B

9C

9E

9D

4B

4A

5A

5A

5C

5C

5A

5A

5C

5C

5D

5D

5D

5D

5B

5B

5B

5B

A

THICK WALL INSTALLATION

THIN WALL INSTALLATION

B

A

B

HOT

HOT

COLD

COLD

This manual is related to the following products: