beautypg.com

English – Pfister F-531-4PAS User Manual

Page 3

background image

ENGLISH

ENGLISH

8

9

7

10

7 HANDLE ATTACHMENT

Place Plastic Seal Rings (7A) against the bottom of Handle Hubs (7B). Connect Handles
(7C) onto Valve Adapters (7D) and be sure Valves and Levers are in the “OFF” position.
Secure handles by holding the Lever (7E) in place and tighten the Hubs (7B) by rotating
them in a clockwise direction.
To remove handles, rotate Hubs (7B) in a counterclockwise direction.

8 SPOUT BODY INSTALLATION

Apply plumber’s putty into groove on bottom of Gasket (8A) per manufacturer’s
recommendations. Place Gasket (8A) under base of Spout Body (8B). From above
sink, insert Mounting Shank (8C) through center hole of sink.
From underneath sink, place Square Washer (8D) and Locknut (8E) over Pull-Out Hose
(8F). Thread loosely onto Mounting Shank (8C). Tighten faucet firmly to sink.

9 HOSE CONNECTION TO VALVE BODY

Slide the End Connectors (9A) with arrow (9D) pointing up onto the Valve Bodies (9B).
Push the End Connectors (9A) all the way up until completely seated. Be careful not
to damage O-Rings (9C).
Reverse steps to remove Hose Connection.

10 WATER SUPPLY CONNECTIONS

First, thread Inlet Connectors (10A) into Water Supply Lines (10B). Then, insert Inlet
Connectors (10A) into Valve Bodies (10C).

Hot water supply lines go into left inlet.

Cold water supply lines go into right inlet. (Supply lines not included). Please follow
manufacturer’s instructions when installing supply lines. Next, insert Clips (10D) into
Valve Body Holes (10E), to secure unit.

WARNING: Do not twist Inlet Connectors (10A) once installed!

3

9C

9C

8A

8C

8D

8E

8F

8B

9B

9A

9A

9A

9D

9B

7A

7B

7E

7B

7A

7B

7C

7C

7D

7D

HOT

COLD

10A

10C

10C

10D

10B

10E

10D

10C

10B

10A