beautypg.com

ODL Sliding Patio Doors with Blinds Between Glass User Manual

Page 3

background image

INSTALLATION INSTRUCTIONS

for Doors with Integral Nailing Fin (JII006-ODL)

3

1. Cut a piece of sheet

material to the
length shown.

2. Lightly crease folding

lines 1/2" in from the
two short sides and
one long side.

3. Measure the distance

from the nailing fin
to the interior edge
of the frame and
add 9/16".

4. Take this distance

from the back edge
and lightly crease a
folding line across
the sheet material.

5. For step-down

landings, cut 1/2" in
at this line on both
sides of the sheet
material.

6. For continuous

slab, cut across the
folding line.

7. Fold the three back

sides up to make a
3-sided box, and,
for step-down
landings, fold the
front flap down.

• Verify the width and

height of the patio
door are each 1/2"-
3/4" smaller than
the rough opening
width/height.
mulled units should
be 3/4" smaller.

• Verify the rough

opening is square.
The (A) and (B)
measurements
should be the same.
maximum allowable
deviation from
square is 1/4".

2

INspeCT rOuGh OpeNING

A

B

D

C

e

Verify Square, Level, & Plumb

• Verify the rough opening is level and plumb (C). The maximum

allowable deviation is 1/8".

• The rough opening sill must not be crowned or sagged (D).
• The exterior face of the rough opening must be in a single plane (E)

with less than 1/8" twist from corner to corner.

• Minimum double studs should be used at all rough openings.
• The header must be supported by trimmer studs.

prepAre sILL pAN

3

Frame

width

+9/16"

Folding Line

Length of rough opening sill plus 1"

1/2"

1/2"

measure

frame

width

Interior

Continuous slab

step-down

Fold sides and back up

Fold corner

forward

Fold front

flap down

4

prepAre rOuGh OpeNING

FOR ReTROFIT INSTALLATIONS

After removing the old patio door, remove sufficient siding to expose at
least 9" of intact building wrap. If damaged, apply new building wrap
in a shiplap manner. Verify trimmer studs and header are structurally
sound. Continue with the instructions.

PRePARe BUILDING WRAP

1. Trim building wrap

flush with the edges
of the rough opening.
Verify this does not
void manufacturer’s
warranty.

2. At the head, slit

building wrap 6" at
45°. Tape up as shown.

45˚

6"

PRePARe SILL (CONTINUOUS SLAB ONLy)

mark a line in the
rough opening across
the front and back of
the sill pan as shown.
remove sill pan and
apply three beads of
sealant between the
marked lines.

sealant