beautypg.com

Vestil FJB series User Manual

Separate inner and outer tube, Hardware/pins are located inside the jack assembly, Vestil manufacturing co

background image

Rev. 02/19/14

FJB-HARDWARE KIT







































Vestil Manufacturing Co.

2999 North Wayne Street, P.O. Box 507, Angola, IN 46703

Telephone: (260) 665-7586 Toll Free (800) 348-0868 Fax: (260) 665-1339

www.vestilmfg.com e-mail:

[email protected]

BASEMENT FLOOR JACK
FJB-150 / 100 / 36 / 16 HARDWARE KIT

Shipment includes:


1. Locking pin (2)
2. Turning bar
3. Jack assembly (inner & outer

tube, mounting feet)


**Unit is shipped with pins inside
tube to reduce packaging and
potential loss of parts**

**Inner & outer tubes are marked
with arrows.

(See FIG. 1)


--Separate inner and outer tube.

(

See FIG. 2)

--Hardware/pins are located inside
the jack assembly.**

(See FIG. 3 & 4)

FIG. 1

FIG. 2

FIG. 3

FIG. 4