beautypg.com

Voltage requirements, Placement and mounting, Hub location – Asante Technologies FH208B User Manual

Page 15: Self-adhering rubber feet, Desk stands, Voltage requirements -5 placement and mounting -5, Link/act 100mbps

background image

Cabling and Voltage Requirements

Page 2-5

Voltage Requirements

Voltage requirements for all models:

100 to 240Vac, 50/60Hz, 1.2A maximum

Important! Check the AC power line voltage used in your
area.

Placement and Mounting

Hub Location

The location chosen for the Dual-speed FriendlyNet Hub should be less than
100 meters from servers, workstations, or switches.

Caution! Category 5 cables are environment-sensitive.
Make sure that the cable route is not too close to electro-
magnetic noise sources such as power lines or fluorescent
lights.

Self-adhering Rubber Feet

To place the hub on a the desktop, apply the self-adhering rubber feet to the
bottom four corners as shown in Figure 2-8.

Figure 2-8 Self-adhering Rubber Feet

Desk Stands

Desk stands easily attach to a hub without screws, bolts or tools. See Figure 2-9.

To stack hubs using desk stands:

1

Attach two stands to each side of the first hub.

FriendlyNet

FH216

Link/Act

100Mbps

MDI – II

MDI – II

1

2 3

4

5

6

7

8

9

10

11

12

13

14

15

16

1 3 1 4 1 5 1 6

5

6

7

8

9

1 0

1 1

1 2

1

2

3

4

16-port Dual-speed Ethernet Hub

Auto

Power

Switch

Collision

10 100

or

or

1 0 / 1 0 0 M b p s P o r t s

1 0 / 1 0 0 M b p s P o r t s