Commissioning

Important

For the extended limited warranty to apply, you must perform these tests, record the results on the SC / SCM Testing Log, and retain
a copy of the record.

Insulation Resistance Test with a megohmeter

This test ensures that the insulating jackets of the cable are not damaged. A low value indicates the cable has been damaged and must be
replaced. A megohmeter adjusted to a minimum 1000 VDC should give a measured value at least 20 megohm (M

Ω).

Megohmeters apply high voltage and could shock or cause serious injury if improperly used. Follow megohmeter instructions
for safe and proper use.

• Connect the ground wire to the black lead and both power wires to the red lead of the megohmeter.

• Adjust the megohmeter to a minimum 1000 VDC.

• Make sure the megohmeter reads at least 20 megohm (M

Ω). If you get a different reading, contact the factory.



Record these readings on the SC / SCM Testing Log under section “Record 4: Final Commissioning”.

Insulation Resistance Test with a digital multi-meter

This test ensures that the insulating jackets of the mat are not damaged. A low value indicates the cable has been damaged and must be re-
placed.

• Connect the ground wire to the black lead and both power wires to the red lead of the multi-meter.

• Make sure the meter reads “Open” or “OL” or whatever your meter shows when the test leads are not touching anything. If you get a differ-
ent reading, contact the factory.

• Record these readings on the SC / SCM Testing Log under section “Record 4: Final Commissioning”.

Heating Cable Resistance Test

This test measures the resistance of the SC Cable . SCM Mat and is used to determine circuit integrity.



Set your multimeter to the 200 or 2000 ohm range.



Connect the multimeter leads to the black and white cold lead wires.



Compare this resistance reading to the resistance specified in the Product Selection “Table 1 or Table 2”. The value should be within

±10%. If you get a different reading, contact the factory.



Record these readings on the SC / SCM Testing Log under section “Record 4: Final Commissioning”.

 

SAVE THESE INSTRUCTIONS

FINAL COMMISSIONING

KING ELECTRIC MFG CO · 9131 10TH AVENUE SOUTH · SEATTLE, WA 98108 · PH:206 762 0400 · FAX: 206 763 7738 · www.king-electric.com