Operation – SKC 110-100 AirLite User Manual
Page 8
6
Changing the Batteries
The AirLite is powered by three standard AA alkaline batt eries
located in a compartment on the bott om of the pump (Figure 1, #1).
To change the batt eries, use a slott ed screwdriver to loosen the
screw on the bott om of the case (Figure 1, #2). Open and remove
the compartment door. Remove the existing batt eries and
replace with new batt eries (see batt ery polarity below). Once the
new batt eries are in place, insert the hinge (Figure 1, #3) on the
compartment door under the lip of the case, close the door, and
tighten the screw until secure.
Important: Note the polarity of the batteries.
Note: For maximum run time, insert new batteries in pump before sam-
pling. If using rechargeable AA 1.2-volt NiMH batteries, expect
approximately half the run time stated for disposable batteries.
Note: To prevent corrosion of battery terminals, remove batteries when
AirLite will not be used for an extended time.
Operation
Bottom View
Top View
1 Battery Compartment Door
2 Battery Compartment Screw
3 Hinge
4 Inlet
5 Control Cover (open)
6 Flow Adjustment Screw
7 LED
8 On/Off Button
9 Belt Clip (back of pump)
Hinge
Polarity of Batteries
Screw
Figure 1
Top and bottom views
1
7
4
6
1
2
3
8
9
+
+
-
-
-
+