Vk series, General pump, Screw calibration – General Pump VK Repair Manual User Manual
Page 22

GENERAL PUMP
A member of the Interpump Group
VK SERIES
3. SCREW CALIBRATION
Screws are to be fastened exclusively using a torque wrench.
Description
Exploded View
Position
(From Owner’s Manual)
Fastening
Ft. Lbs.
Fastening
Nm
Cover Fixing Screw
9 and 12
7.4
10
Oil Discharge Plug
11 and 79
29.5
40
Lifting Bracket Fixing Screw
20
29.5
40
Con-rod Cap Fixing Screw
21
28
38*
Plunger Fixing Screw
29
14.8
20
Head Fixing Screw
48
59
80**
Liner Fixing Screw
47
25.8
35***
Support Fixing Screw
60
11
15****
Reduction Gear Cover and Box Fixing Screw
74
29.5
40
Ring Gear Fixing Screw
71
51.6
70
* The con-rod cap fixing screws must be tightened at the same time respecting the
phases indicated on page 7.
** The head fixing screws (exploded position 48) must be tightened with a torque wrench respecting
the sequence shown in the diagram in fig. 68.
*** The liner fixing screws (exploded position 47) must be tightened in a single phase, respecting
the sequence shown in the diagram in fig. 68.
****The support fixing screws must be tightened in a single phase respecting the sequence shown in
fig. 67.
Page 22
Screws - positions 47 and 60 must be tightened with a torque wrench, lubricating the
threaded shank. (We recommend the use of Molybdenum Bisulphide grease part
#F12001500.